Project Description

Customer: Regional Directorate of Sidi Bouzid
Location:  Sidi Bouzid
Surface Area: 450,000 m2
Starting date:   2008
Completion date : 2008

۰ The project consists of creating a ring road in 2×2 lanes to bypass the city of Sidi Bouzid in the Governorate of Sidi Bouzid over a length of 6 km with the development of plane intersections at the level of the intercepted roads.

۰ The project aims to:

– The creation of a belt road in 2 x 2 lanes of 7.0 m each, a TPC and shoulders of variable widths according to the existing right-of-way,
– The installation of adequate horizontal and vertical signage,
– Public road lighting.

Description of the services provided by your staff

۰ Development of a summary preliminary project and a feasibility study (APS + EF): Layout, works, variants, movement of concessionary networks, estimate, etc.

۰ Preparation of an environmental impact study (EIA)

۰ Preparation of the tender dossier for the selected variant (DAO)