Project Description
Customer: Regional Directorate of Sidi Bouzid
Location: Sidi Bouzid
Surface Area: 450,000 m2
Starting date: 2008
Completion date : 2008
۰ The project consists of creating a ring road in 2×2 lanes to bypass the city of Sidi Bouzid in the Governorate of Sidi Bouzid over a length of 6 km with the development of plane intersections at the level of the intercepted roads.
۰ The project aims to:
– The creation of a belt road in 2 x 2 lanes of 7.0 m each, a TPC and shoulders of variable widths according to the existing right-of-way,
– The installation of adequate horizontal and vertical signage,
– Public road lighting.
Description of the services provided by your staff
۰ Development of a summary preliminary project and a feasibility study (APS + EF): Layout, works, variants, movement of concessionary networks, estimate, etc.
۰ Preparation of an environmental impact study (EIA)
۰ Preparation of the tender dossier for the selected variant (DAO)